Skip to content
Dave Brown

How should I structure my engineering team at 5, 10 and 20 engineers?

At 5 engineers, keep one team led by a senior tech lead. At 10, split into two teams of about 5, each owning a product area, with one engineering manager. At 20, run three or four teams of 5 to 6 with two or three managers and a clear head of engineering. Structure should follow the product, not the org chart.

Dave Brown · CTO & Executive Advisor · Updated

The right structure depends on how much coordination your people can carry in their heads. Below about 6 people, everyone knows everything and process is overhead. Above 8 or 9, nobody knows everything and you need boundaries. The three sizes you asked about sit on either side of those thresholds.

What works at 5 engineers?

One team, one backlog, one weekly priority list. Pick a single senior engineer as tech lead who decides how things get built and who reviews the risky changes. This person still writes code, probably 60 to 70 percent of their week.

Do not create sub-teams yet. Splitting five people into a "frontend team" and a "backend team" creates handoffs, and handoffs are where small teams lose weeks. Hire full-stack people where you can, and keep one person (maybe you, maybe the tech lead) accountable for what gets built next.

The thing to get right at this size is ownership of production. Someone must be named for deploys, uptime and the on-call phone. If it is "everyone," it is nobody.

What changes at 10 engineers?

At around 8 to 10 people the tech lead can no longer review everything, and standups start running long. This is when you split into two teams of about 5, and the split should follow the product, not the technology stack.

Good splits at this size:

  • Customer-facing product versus platform, billing and integrations.
  • Two product areas that have separate users and separate metrics.
  • New features versus keeping the existing system healthy, if reliability is hurting you.

Each team gets a clear mission, a lead, and the ability to ship most changes without asking the other team. This is also where you need your first engineering manager, someone whose job is people and delivery rather than code. If one lead is still half-coding and half-managing nine people, you have a bottleneck.

What does 20 engineers look like?

Three or four teams of 5 to 6, each owning a slice of the product end to end. You now need two or three engineering managers, and someone above them: a head of engineering or VP who owns hiring, hiring quality, and the relationship with the rest of the company.

Two new things appear at this size. First, shared infrastructure (build pipelines, cloud accounts, observability) becomes its own problem, and one or two people should own it as a small platform group. Second, you need written decisions: short architecture notes so teams do not quietly build conflicting things.

I grew teams at Infor in Prague from 6 to 20 developers, and my rule since then is simple: draw team lines around customer problems, not technology layers.

How do the sizes compare?

EngineersTeamsManagersKey risk
510 (tech lead)No named owner of production
1021Lead stuck half-coding, half-managing
203 to 42 to 3 plus a headTeams building conflicting systems

When should I break these rules?

If your product is a single tightly coupled system, such as a data pipeline, keep it as one team longer, up to 8 or 9. If you have a regulated product or heavy security needs, carve out the owner of compliance early. If half your engineers are contractors in another time zone, give them a whole area to own rather than scattering tasks among them.

What I'd do

Stay as one team until the pain is visible: long standups, review queues, people stepping on each other. Then split by product area and hire your manager at that moment, not before. Revisit the structure about every 6 months, because the right shape at 10 is wrong at 20.

Where I come in. If this is a decision in front of you right now, it’s the kind of thing I help with through Engineering Organization & Leadership. Often begins with a short diagnostic phase, followed by ongoing advising through implementation.

Get in touch

Available for a small number of conversations.

If something here is relevant to a decision you’re facing, I’d like to hear about it.