Skip to content
Dave Brown

How do I build an engineering career ladder for a small company?

Keep it small: 4 or 5 levels (junior, mid, senior, staff, and a lead or manager step), two tracks (individual contributor and management), a one-page description of expectations per level, and a pay band for each. Write it once, calibrate it against your actual team, and revisit it every 6 to 12 months.

Dave Brown · CTO & Executive Advisor · Updated

A career ladder answers one question for your engineers: "What do I have to do to grow here, and what does it pay?" Small companies skip it because it feels like big-company bureaucracy. Then they handle every promotion and raise as a negotiation, which is slower, less fair and drives resentment.

How many levels do I need?

Fewer than you think. For a team under 30, five levels is plenty:

LevelTypical scopeYears of experience (rough)
JuniorWell-defined tasks with guidance0 to 2
Mid-levelOwns features end to end2 to 5
SeniorOwns projects, mentors others5 to 9
StaffShapes technical direction across teams8 plus
Lead or ManagerLeads people or a technical areavaries

Years are a rough guide only. Never promote on tenure, and write that on the page.

What goes on the one-pager for each level?

Describe expectations in four areas, a few sentences each:

  • Technical skill: quality of code, design, debugging.
  • Scope and autonomy: how big a problem they can own without help.
  • Impact: what changes in the product or team because of their work.
  • Collaboration: mentoring, communication, review quality.

Write in observable behavior. "Designs a feature that touches three services without guidance" is useful. "Demonstrates strong ownership" is not. The test is whether two managers reading the same description would reach the same conclusion about a person.

Do I need two tracks?

Yes, once you have senior people. Without a technical track, the only way to advance is to manage, and you will lose your best builders to jobs they dislike or to competitors who offer a staff title. The individual contributor track should pay about the same as management at equal levels. A senior engineer and a first-line manager typically sit in the same band.

How do I attach pay?

Set a band per level (minimum, midpoint, maximum) using current market data for your location and funding stage. For example, a US senior engineer might sit in a band of $150,000 to $200,000, depending on city and stock. Put new hires near the midpoint, and move people through the band based on performance. Decide up front whether you publish bands. Many companies do, and transparency reduces disputes more than it creates them.

Equity should follow level too, in a simple table. Avoid ad hoc grants, because people compare notes.

How do I make promotions work?

  1. Run promotion decisions twice a year, not whenever someone asks.
  2. Require the manager to write a short case with examples against the level description.
  3. Have a second leader review it, to keep standards consistent.
  4. Tell people what is missing if the answer is no, with a timeline.

The biggest benefit of a ladder is not fairness on paper. It is that engineers stop guessing, and conversations about growth become specific.

What mistakes do small companies make?

They build 10 levels with fine distinctions nobody can apply. They copy a large company's ladder wholesale. They set it once and never update it. Or they publish it without calibrating against existing people, so half the team discovers they are in the wrong level.

What I'd do

Draft five levels and two tracks in an afternoon, place every current engineer on it, and fix the places where it feels wrong. Share it with the team, ask for edits, then use it for the next review cycle. A rough ladder you use beats a perfect one you never finish.

Where I come in. If this is a decision in front of you right now, it’s the kind of thing I help with through Engineering Organization & Leadership. Often begins with a short diagnostic phase, followed by ongoing advising through implementation.

Get in touch

Available for a small number of conversations.

If something here is relevant to a decision you’re facing, I’d like to hear about it.